All South Lightning Protection  |  SEO Retainer — Nichefinder AI Agency  |  Report Period: April 2026

Monthly Progress Report — April 2026

April in context: With Phase 1 foundation complete (all 3 GBPs ranked, roadmap delivered), April was the transition into Phase 2 — press release distribution, AI system activation, and preparing the Q2 execution pipeline. Blog content and citation submission begin in May.

📈 April Key Metrics

3/3
GBP Listings Live
Maintained ✅
17/22
Tampa Keywords #1–2
Mar 11 scan — Q2 rescan pending
78
Tampa Reviews
4.7 ★ — campaign launching May
1
Press Release
ZooTampa — EIN Presswire ✅
LIVE
AI Email Triage
Daily digest — Apr 30 ✅
5
Directory Citations
30+ plan ready — submit May

🔄 Campaign Progress: Baseline vs. April 2026

Metric Dec 2025 (Baseline) Mar 2026 Apr 2026 Change (Mar → Apr)
GBP Listings Live 1 3/3 ✅ 3/3 ✅ Maintained
Tampa Map Pack Rank Not tracked #1.00 (17/22 kw) #1.00 (17/22 kw) No change — rescan Q2
Tampa Reviews ~78 78 78 Steady — campaign pending
Press Releases Published 0 0 1 ✅ +1 — ZooTampa (EIN Presswire)
Blog Posts Published 0 0 0 Gap continues — begins May
Directory Citations Untracked 5 5 Plan built — submission May
AI OS — Email Triage Not started In development LIVE ✅ Chuck's daily inbox digest activated
Self-Hosted n8n Server Not started Not started LIVE ✅ Hetzner server — n8n.nichefinders.ai

✅ April Deliverables

SEO & Content

Deliverable Date Status
ZooTampa Press Release — Published
EIN Presswire distribution. Covers ASLP's lightning protection installation at ZooTampa. Builds backlinks + brand authority in Florida market.
Apr 1, 2026 Live ✅ [View]
GBP Posts — Sunrise & Jacksonville (14 posts total)
7 posts per location written and ready. Topics: services, completed projects, seasonal safety tips. Blocked on client photo delivery.
Apr 13, 2026 Ready to publish — awaiting photos
GBP Photo Request — Sunrise & Jacksonville
Formal request sent to Chuck: 10+ photos per location (facility, team, projects). Photos increase GBP engagement 40%+ and improve Map Pack signals.
Apr 13, 2026 Awaiting client delivery
Citation Build Plan — 30 Directories
Full Tier 1 citation list across Tampa, Sunrise, and Jacksonville. Mapped to each location with NAP data. Ready to submit.
Apr 13, 2026 Plan complete — submission begins May
Local Dominator Keywords — Sunrise & Jacksonville
Keyword sets built for both markets. Ready to run first post-verification scan.
Apr 13, 2026 Ready — scan scheduled Q2

AI OS Program

AI OS — April was the go-live month for Phase 1 automation. Chuck's inbox is now triaged by AI every morning at 5:45 AM ET — every email categorized, prioritized, and summarized before the workday starts.
Deliverable Date Status
Self-Hosted n8n Infrastructure — Live
Dedicated Hetzner server at n8n.nichefinders.ai. SSL, Caddy reverse proxy. All future automations run here.
Apr 21, 2026 Live ✅
Chuck Email Triage — Activated
Daily 5:45 AM ET digest to chuck@aslp.net. Reads inbox → Claude AI triage → formatted HTML summary with priorities and action items.
Apr 30, 2026 Live ✅
Trade Show Video — Delivered
Commercial video produced for trade show deadline (April 28).
Apr 2026 Delivered ✅

🔍 Organic Search — GSC Tracking (Month 2)

April is the second month of GSC data collection. Full month-over-month comparison will be available at the end of Q2. The 90-day baseline (Feb–May) established in March remains the reference point for measuring progress through June.
Metric 90-Day Baseline (Feb–May) Assessment
Total Clicks 436 Tracking in progress — compare at June rescan
Total Impressions 70,287 Solid B2B niche volume
Average CTR 0.62% Title tag rewrites begin May — expect improvement
Average Position 13.1 Content expansion drives this down Q2–Q3
#1 opportunity page /cost page — 17,570 impr. at pos 6.2 Title rewrite is May Priority #1

📍 GBP Status — April

Location Status Reviews Photos GBP Posts
Tampa (HQ) Optimized ✅ 78 / 4.7 ★ 20+ ✅ Jan + Feb published ✅
Sunrise Live ✅ Pending — request sent Apr 13 7 posts ready — waiting on photos
Jacksonville Live ✅ Pending — request sent Apr 13 7 posts ready — waiting on photos

📝 Honest Assessment — What's Behind

Item Target Actual (Q1+Apr) Plan
Blog Posts 16 (4/mo × 4 months) 0 4/month begins May — drafts in production
Directory Citations 30+ by end of Q2 5 (plan built) 30-directory submission begins May
Sunrise + JAX photos 10+ each — Q1 Awaiting client Blocked on Chuck — request resent Apr 13
Review campaign 78 → 100+ (Tampa) Not launched Launch May — strategy ready
Sunrise + JAX scan Q2 first scan Not yet Scheduled May–June after photo delivery
Blog content is the highest-leverage gap. With 70,000+ monthly impressions and an average CTR of 0.62%, new blog content targeting high-impression queries (cost page, farm page, hospital page) will directly improve organic clicks. Four posts launch in May.

🎯 May Priorities

# Action Impact Owner
1 Cost page title tag rewrite — 17,570 impressions, pos 6.2, 0.40% CTR → target 2% Critical NF Agency
2 Submit sitemap in GSC — currently no sitemap submitted, Google crawling blind Critical Chuck / IT
3 Launch 4 blog posts — targeting delta grounding, cost guide, FL compliance, commercial installations High NF Agency
4 Send Sunrise + Jacksonville photos — unlocks 14 GBP posts + Map Pack ranking improvement High Chuck (client action)
5 Begin 30-directory citation submission — Tier 1 across all 3 locations High NF Agency
6 Launch Tampa review campaign — target 78 → 100+ reviews High NF Agency + Chuck
7 Farm page title tag — pos 6.1, 1,966 impressions, 0.05% CTR Medium NF Agency
8 Crystal inbox triage (AI OS Phase 2) — same workflow pattern as Chuck's Medium NF Agency

📅 Year-Long Metrics Tracker

All key metrics tracked month-over-month for the full 2026 campaign year.

Metric Dec 2025 Jan Feb Mar Apr May Jun
GBP Listings Live 1 1 1 3 ✅ 3 ✅
Tampa Map Pack Rank Not tracked #1.00 (17/22) #1.00 (17/22)
Tampa Reviews ~78 ~78 ~78 78 78
Tampa Rating 4.7 ★ 4.7 ★ 4.7 ★ 4.7 ★ 4.7 ★
Citations 5 5 5
Press Releases 0 0 0 0 1 ✅
Blog Posts (cumulative) 0 0 0 0 0
AI OS — Email Triage In dev LIVE ✅

📞 Questions or Next Steps

May is an execution month — blog posts, citations, title tag fixes, and review campaign all launch simultaneously. We'll have measurable GSC movement to report by the end of Q2.

Agency: Nichefinder AI Agency Phone: (863) 999-9152 Schedule: Book a Call